Welcome
Guest
, you are in:
<root>
•
Login
FLSmidth QCX wiki
Main Page
Random Page
Create a new Page
All Pages
Categories
Navigation Paths
Administration
File Management
Word Import
Create Account
Search the wiki
Back
BLX configuration Steps - Standard steps
Modified on 2021/06/21 14:47
by
MKR
Categorized as
QCX BlendExpert Mill V8
'''These are the standard procedure steps for commissioning BLX. The list is just to give an overview, please note that some of the steps will be done simultanious.''' # Hopefully the factory have unpacked and setup the server, and connected it to a screen and powered it up. # '''Do Backup of the existing system - save separately on server. ''' # Check installed license file - is it permanent? # Check versions of the installed components: Core, Framework, ECC, QCX & BLX # Download and install BLX PUP. # Install the correct driver for communication with XRF and if present an Online analyser # Set up communication with lab equipment # Set up QCX lab for XRF communication # Configure and prepare solution files for BLX # Import BLX solution files # Configure BLX HMI screens # Configure Points to OPC server or PLCs # Start to get samples to BLX # Let BLX build database during 12-24 hrs # Put blx in control
Meta Keywords:
Meta Description:
Change Comment:
FLSmidth