Welcome
Guest
, you are in:
<root>
•
Login
FLSmidth QCX wiki
Main Page
Random Page
Create a new Page
All Pages
Categories
Navigation Paths
Administration
File Management
Word Import
Create Account
Search the wiki
Discuss (0)
View Page Code
History
BLX configuration Steps - Standard steps
Print
RSS
Modified on 2021/06/21 14:47
by
MKR
Categorized as
QCX BlendExpert Mill V8
These are the standard procedure steps for commissioning BLX. The list is just to give an overview, please note that some of the steps will be done simultanious.
Hopefully the factory have unpacked and setup the server, and connected it to a screen and powered it up.
Do Backup of the existing system - save separately on server.
Check installed license file - is it permanent?
Check versions of the installed components: Core, Framework, ECC, QCX & BLX
Download and install BLX PUP.
Install the correct driver for communication with XRF and if present an Online analyser
Set up communication with lab equipment
Set up QCX lab for XRF communication
Configure and prepare solution files for BLX
Import BLX solution files
Configure BLX HMI screens
Configure Points to OPC server or PLCs
Start to get samples to BLX
Let BLX build database during 12-24 hrs
Put blx in control
FLSmidth